  1. Why is this a design-stage decision?
  2. What is done internationally?
  3. What does Israeli law say about work at height?
  4. Method: three questions for every maintenance task
  5. Plant rooms: what to check
  6. Roof and facade: how to get there without endangering people or the waterproofing
  7. Shafts, ceilings, car park and landscaping
  8. Common mistakes, and why they happen
  9. What to require in writing from the architect and the consultants
  10. How we do it

Designing access for maintenance determines whether the building's systems can be serviced safely and at a reasonable cost, or whether every job will need scaffolding, a crane or taking down a ceiling. A system that is hard to reach gets maintained less, and so breaks down more. Access is set in the drawings, and once the building is built, correcting it is expensive and sometimes impossible.

Why is this a design-stage decision?

During design, each consultant designs their own system, and the architect is responsible for how the building looks. The question of how a technician will reach a valve, replace a motor or clean a facade often falls through the cracks. In Israel, the Work Safety Regulations (Work at Height) place the obligations on the employer of the people working at height, not on whoever designed the building. So the cost of incomplete design falls on the management company and the owners, for the whole life of the building.

What is done internationally?

In the UK, regulation 9 of the CDM Regulations 2015 (Construction Design and Management) requires designers to eliminate, so far as is reasonably practicable, foreseeable risks to the people who will maintain or clean the structure as well. A risk that has not been eliminated must be reduced, and recorded in the building's health and safety file. The British Standard BS 8560 gives designers a code of practice for building safe work at height into the early design stages.

In Singapore, the Building and Construction Authority (BCA) has developed a complete programme of design for maintainability: guides for residential and non-residential buildings, a guide to designing facade access, and a maintainability section in its green building rating. In July 2026 the authority published preliminary results from a study of four projects: the maintainability measures added 0.6% to 1.5% to construction cost in the commercial buildings and about 0.2% in residential, and most of them paid for themselves in less than six years.

The example the authority gave is simple: a fixed ladder that goes directly to the fan and basin of a cooling tower, instead of temporary scaffolding for every service. According to the authority, for many of the measures studied, annual workdays fell by more than 60%.

What does Israeli law say about work at height?

Under the regulations, work at height is any work, including getting to the place of work, in which a worker could fall more than two meters. Almost every job on a roof, a facade or suspended equipment falls within this definition.

Permanent anchor lines are installed with the approval of a certified inspector, a registered mechanical or civil engineer, and kept in good working order. They are inspected at the frequency set by the manufacturer, or once every five years if none was set. So it is worth designing them as part of the building, and handing their documents over for the building file.

Method: three questions for every maintenance task

The UK's Work at Height Regulations set an order of priorities: avoid work at height where possible; otherwise prevent falls; and only as a last resort minimize the distance and consequences of a fall. This order can be turned into a check of the drawings:

  1. Can the work at height be eliminated? Move equipment from the roof edge to the center of the roof, read meters remotely, choose windows that can be cleaned from the inside.
  2. If not, can falls be prevented for everyone? A fixed guardrail, a roof with a perimeter parapet, or a fenced working platform. Protection of this kind works without the worker having to do anything.
  3. Only if that is not possible either: anchor lines and personal protective equipment, which require training, equipment in good condition and periodic inspection.

Alongside these questions, build an access table: a row for every item of equipment, with the task, the frequency, who carries it out, how they get there, how the largest component comes out, and what needs to be closed off during the work. A row with no answer is a comment on the drawings.

Plant rooms: what to check

  • Replacement route. The large equipment in the room will be removed and replaced one day. Check door widths, headroom, turns and the route to the street or to a lifting opening.
  • Service clearances in line with the manufacturer's instructions, so that panels can be opened and components pulled out.
  • Floor drainage, so that a leak from a pump does not flood the room and whatever is below it.
  • Lighting, ventilation and power outlets for working, and space for spare parts.
  • Entry from the common areas, not through a private unit or a shop.

Roof and facade: how to get there without endangering people or the waterproofing

  • Permanent, safe access to the roof, not a temporary ladder or a narrow hatch in the ceiling.
  • Marked walkways to every equipment unit, so technicians do not walk on the waterproofing layers.
  • Space and a route for lifting heavy equipment when it is replaced.
  • Clearance around every unit, rather than equipment packed so tightly it cannot be opened.

The facade maintenance method is chosen together with the facade itself. The options are a permanent rooftop installation, a suspended cradle that connects to fixed points, rope access, or mobile lifting platforms in low-rise buildings. In the UK, a permanent installation is designed to BS 6037-1, and anchor points to BS EN 795 and BS 7883.

Each method has its own requirements: bases and rails on the roof, anchorage in the facade and clear space in the street. Also ask whether there are areas that no method reaches, such as recesses, canopies and corners.

Shafts, ceilings, car park and landscaping

  • Shaft access doors that make it possible to reach every valve and every branch.
  • Valves and meters at an accessible height, not behind fixed cladding or inside an apartment.
  • Labeling of pipes and cables, and free space for future expansion.
  • Access panels in ceilings below valves and air conditioning units. In a lobby with a continuous ceiling, a mistake here means taking down the ceiling at every fault.
  • In the car park, pipes and fans above the driving aisles, not above parking spaces, which would otherwise have to be cleared for every service.
  • In landscaping, inspection chambers and irrigation valves that are not covered by fixed paving or a planting bed.

Common mistakes, and why they happen

  1. Equipment with no way out of the room. The room is designed around the equipment inside it, and no one draws the day it will be replaced. The cost: opening up a wall, or a crane in the street.
  2. Equipment on the roof edge with no guardrail. This location is chosen to hide the equipment from the street. The cost: every service becomes work at height with personal protective equipment.
  3. A cleaning method chosen after the facade design has been finalized. The facade is approved during the design process, and maintenance is left to the end. The cost: anchorage added after the fact, through the waterproofing, or areas that are never cleaned.
  4. A technical room that can only be entered through a tenant's space. The layout is driven by lettable area. The cost: coordinating with the tenant for every service, and a locked room during a fault.
  5. Access panels not coordinated between consultants. Each consultant marks their own, and the architect receives the ceiling at the end. The cost: panels in the wrong place, and valves left behind plasterboard.

What to require in writing from the architect and the consultants

  • "An access table will be submitted for every item of equipment: task, frequency, access route and replacement route."
  • "A replacement route plan will be submitted for all heavy equipment, up to the street or a lifting opening."
  • "All access panels will be marked on a ceiling plan coordinated between all the consultants."
  • "The facade plan will include the cleaning and maintenance method, including anchorage, roof bases and any areas not covered."
  • "Anchor lines will be designed as part of the building, and handed over with the installation approval and the manufacturer's instructions for periodic inspection."

How we do it

At the design stage we advise from a maintenance perspective, and flag missing access points before they are built. We build the Tik Mitkan (the facility file) and the maintenance file, and set up the management operation before occupancy. When we also manage the building after occupancy, the comments we made at the design stage are tested by us on site.

Are your drawings still open to changes? Read about maintenance consulting during construction and about what a maintenance consultant adds to a project. For the periodic inspections the building will need after occupancy, see periodic building inspections.

Talk to us

We'd love to get to know your property

A short call to understand what you need, a site visit, and a detailed itemized proposal. No sales pressure and no commitment.

  • An itemized proposalCleaning, maintenance, security and management, each priced separately, so you can really compare.
  • A free site visitThe survey we make during the visit is yours to keep, even if you choose another company.
  • An answer within two business daysUrgent fault? Our service center is open 24/7 at +972-3-7736777.
Phone+972-3-7736777Emailoffice@achlagroup.com
HoursSun–Thu 08:00–17:00 · 24/7 service center

Leave your details

Fields marked are required. The rest help us come prepared.

Your details are used only to handle your inquiry and are not given to others for their own use. Privacy policy