The waste room and the loading and unloading area in a retail or mixed-use complex should be designed around the waste and deliveries of the tenants who will actually arrive, not around the minimum in the regulations. A room that is too small, or a dock a truck cannot get into, is discovered on opening day and stays with the complex for years. The result is odor, pests, trucks blocking the street and complaints from residents and tenants, which are very hard to fix once the building has been built.
What is mandatory in Israel, and what does it not cover?
The waste storage chapter of Israel's Planning and Building Regulations (the design regulations code, Sefer Takanot HaTachan) sets requirements for the waste storage room: dimensions that suit the type and number of containers, natural or mechanical ventilation (and with mechanical ventilation, exhaust above the building roof), a water tap, prevention of pest entry, and a secondary room where there is a compaction unit. The regulations also require separation into at least two streams. Alongside them, many local authorities have their own guidelines on collection and location. In a mixed-use complex, check with the building designer which of the requirements also apply to the commercial part.
These requirements are a floor, not a design. They do not know whether the second floor will have a restaurant or a fashion store, and they do not deal with deliveries at all. That is something the developer has to plan.
What is done in other countries?
In the UK, the official guidance to the Building Regulations (Approved Document H, section H6) sets distances: a resident should not have to carry waste more than 30 meters horizontally, and the containers should be within 25 meters of the collection point set by the authority. The standard BS 5906 is a code of practice for waste management in buildings, residential and commercial, covering storage, collection, separation and on-site treatment.
The more interesting tool is the Delivery and Servicing Plan from Transport for London. The developer submits it at the permit stage, and responsibility for it passes to the owner and the management company on occupancy. It covers the physical design, vehicle swept paths, docks and regular and refrigerated storage, and also the procedures: booking unloading slots in advance, moving deliveries outside peak hours without disturbing neighbors, consolidating suppliers, and putting waste out for collection at the right time.
The guidance recommends reviewing the plan again after six months of occupancy and then once a year, and anchoring its requirements in the leases. There is no such obligation in Israel, but nothing prevents adopting it as an internal document of the complex.
The requirements will change during the life of the building
In England, from 31 March 2025, every workplace with ten or more employees must separate food waste, dry recyclable waste and residual waste. In Israel, a 2022 review by the Ministry of Environmental Protection found that source separation of organic waste in commerce is done on a voluntary basis only, and recommended phased regulation.
The conclusion for design: leave room for an additional stream, with power and a water point. A room designed exactly to today's requirements will be too small in a few years.
Method: a waste and delivery balance before you draw
- Planned tenant mix. Restaurants produce a lot of wet waste, shops a lot of cardboard, offices mainly paper and packaging. A complex with a restaurant floor needs a completely different room.
- Volume per stream. Estimate by tenant type and area, and add a margin for holiday and sale peaks.
- Real collection frequency. What the authority or the contractor can actually provide, not what would be convenient to assume.
- Containers and equipment. The number of containers per stream, a compactor, a cardboard baler, and space for maneuvering and washing.
- Delivery map. How many vehicles a day, of which type, at what hours, and how long each one stays. Including personal deliveries to residents and employees, which today are a large part of the traffic.
- Drawing. Only now do you set the size of the room, the number of loading bays and the vehicle routes.
The waste room, the compactor and the cardboard
- A separate room for residential and for retail, so restaurant waste does not pass through the residential lobby.
- A refrigerated room for organic waste from restaurants, when collection is not daily.
- A compactor that suits the collection truck that will actually come, with dedicated power, drainage and a water point.
- A straight route from the room to the truck, with no stairs and no passage through public areas.
- Space for storing cleaning equipment and washing materials next to the room.
The loading dock: what to plan?
A good dock is built around the largest vehicle expected to arrive. Ask the consultant for a swept path analysis, check the clear height, the ramp gradient and a waiting area, so that a truck arriving when the dock is occupied does not stand in the street.
- A service corridor from the dock to the shops, which does not pass through public walkways.
- A freight elevator to all retail floors, separate from the public and residential elevators.
- A delivery room or parcel lockers, so couriers do not wander the floors.
- A temporary area for empty pallets and returns, so they do not stay on the dock.
- A camera and access control, to know who unloaded, when and what was left behind.
How do you prevent odor and pests?
- Exhaust air from the room far from residential windows and from the office air intakes.
- A floor and walls that can be washed, with drainage and a slope.
- A grease separator in the restaurants' drainage lines, with easy access for emptying. Check with the water utility and business licensing what is required. In Europe, design follows the EN 1825 standard.
- Sealed self-closing doors, and fixed monitoring points for the pest control company.
What to anchor in the leases and the bylaws
- "The tenant shall separate waste according to the streams set in the complex, and bear the cost of special collection of waste it produces."
- "Unloading and collection shall take place in the time slots set in the complex's procedure, and by advance booking."
- "No goods, pallets or cardboard may be left on the dock or in the walkways."
- "A tenant operating a kitchen shall empty and maintain the grease separator, and present records on request."
- "Collection costs shall be allocated by a key that distinguishes between restaurants, shops and offices."
In a complex with several tenants, it is also worth centralizing the collection contract with management, instead of each tenant bringing its own contractor. That means fewer trucks and fewer trips.
Common mistakes, and why they happen
- A room at the minimum size. Every meter is allocated to leasable space, and the room gets what is left. The price: containers in the walkways and extra collection paid for every month.
- A dock the truck cannot get into. The clear height was set for a private car and not for a goods vehicle. The price: unloading in the street, fines and bad relations with the neighbors.
- Goods in the public or residential elevators. A freight elevator was cut in value engineering. The price: wear, dirt and complaints from residents.
- Exhaust from the waste room under balconies. The exhaust point was chosen for the convenience of the duct. The price: odor reaching the apartments, and complaints that have no cheap solution.
- Courier deliveries that were not taken into account. The design considered only shop suppliers. The price: courier vehicles at the main entrance and on the sidewalk.
Questions to ask the design team
- From which direction will the garbage truck arrive, and where will it stand during collection?
- What route does a bag of waste from a restaurant on the top floor take to the room?
- Where does the air from the waste room exit, and what is above it?
- Where does a truck wait if it arrives when the dock is occupied?
- Where does a courier leave a parcel for a resident or an employee, without going up to the floors?
How we do it
At the design stage we advise from an operational perspective, and set up the management operation before opening, including unloading and collection procedures. When we also manage the complex after occupancy, the procedures that were planned are the ones actually applied. After opening, the complex has a 24/7 service center and independent quality control.