  1. Why the legal default does not fit a mixed-use complex
  2. What this means for the developer, legally
  3. How is it done in other countries?
  4. The layer map: a working method for the design team
  5. Which systems to separate, and which to keep shared?
  6. How do you measure what each use consumes?
  7. Entrances, elevators and parking
  8. Unsold units: why the budget is also the developer's problem
  9. Questions to ask the design team
  10. Common mistakes, and why they happen
  11. How we do it

In a mixed-use complex, the split of systems and costs between residential, retail and offices is decided at the design stage, not after occupancy. Every shared system without a meter, every entrance that serves two uses and every parking garage without separation later turns into an argument about money. And whatever is not written into the bylaws and the specification before sales is almost impossible to fix afterward, because changing the split requires the consent of those who would lose by it.

Israel's Land Law states that an apartment owner's share of the common property expenses is derived from the floor area of their apartment relative to all the apartments, unless the bylaws set a different rate. An "apartment" under the law also includes a shop and an office. In other words, without suitable bylaws, a ground floor shop participates in the maintenance of the residential elevators, and an apartment on the twentieth floor participates in cleaning the retail plaza.

The law also recognizes a "composite building" (bayit murkav): a condominium made up of several buildings or wings with a separate entrance or separate facilities. When the bylaws state that a wing's common property will be maintained and managed separately, only the apartment owners in that wing bear its expenses. The bylaws can also set a separate general meeting and a separate representative committee (netzigut) for the wing.

What this means for the developer, legally

  • Disclosure in the specification. Under section 6 of the Sale Law (Apartments), a seller whose bylaws change the default rate of participation in expenses must set this out in the specification or the contract. If it did not, it is treated as having undertaken that the provisions of the standard bylaws (ha'takanon ha'matzui) will apply on that matter.
  • A later change is very difficult. Under section 62 of the Land Law, bylaws are amended by a majority of the owners of two thirds of the common property. But imposing on an apartment owner a payment at a rate the law did not set is possible only with that owner's consent.
  • A management company appointed in advance. Under section 6A of the Sale Law, a developer who states in the contract that management will be carried out by a maintenance provider must specify its identity and the terms of engagement. A clause restricting termination of the first engagement is valid for no more than three years, unless the apartment owners extended it.

The practical meaning: the split between the uses has to be settled when the specification is written, that is, before the first sales. Not at the end of construction.

How is it done in other countries?

The problem is familiar in every market that builds mixed-use towers, and the solutions are similar in essence: one shared layer, and above it layers by use.

  • Victoria, Australia. A development can include several owners corporations. Every unit owner is a member of one general corporation and, where needed, of limited corporations too, for example for the parking garage or the elevators. The state's consumer authority describes them as separate cost centers, and notes that they are common in developments that combine residential, retail and parking.
  • Singapore. The law allows a subsidiary management corporation for part of a development, with limited common property for its use. Since the 2018 amendment, in a mixed-use development with a single tier, each use group automatically gets one seat on the management council.
  • United Kingdom. The RICS professional standard on service charges requires expenses to be separated into schedules by service and benefit. It also stresses that in a mixed-use development, the residential part is subject to residential tenant protection law, even when it is let under a single lease. The conclusion: the residential part is always more protected, so plan accordingly.

None of this is binding in Israel. But the principle translates directly into tools that exist here: a composite building, attachments of common property to specific units (hatzmadot), and different participation rates for each wing in the bylaws.

The layer map: a working method for the design team

Instead of arguing about each system separately, build one table in six steps:

  1. Inventory. A list of every system and shared area: elevators, lobbies, air conditioning, pumps, generator, parking garage, waste room, loading dock, roof.
  2. Classification. For each item: serves everyone, serves one use, or serves some of the uses.
  3. Key. For each layer: area, measured consumption, number of parking spaces, or a combination.
  4. Metering. For each item split by consumption, exactly where the meter will be installed, and who will read it.
  5. Anchoring. Transferring the table into the bylaws, the specification and the leases of the commercial space.
  6. Governance. Who decides on each layer, and how disputes between the uses are resolved.

The fifth step is the one most often forgotten. In a complex where the developer or an investor holds the retail part and leases it out, there are two layers of contracts: the bylaws with the apartment owners, and the leases with the tenants. If the keys are not identical, the owner of the commercial space pays according to the bylaws and collects according to the lease, and the gap stays with the owner.

Which systems to separate, and which to keep shared?

Full separation makes construction more expensive and can duplicate equipment that runs only part of the time. The principle: separate what is used in fundamentally different ways, and meter what remains shared.

  • Usually separate: elevators, lobbies and entrances, air conditioning of each use's public areas, access control and operating hours. This is where the difference in hours and load is greatest.
  • Usually shared: fire suppression systems and pumps, generator, main electricity and water connection, envelope and roof. These systems serve the building as one unit, and usually cannot be split.
  • Depends on the project: central air conditioning, parking garage, waste room and loading dock. The decision depends on the size of each use and its operating hours.

How do you measure what each use consumes?

  • Electricity meters for every panel that serves one use, including air conditioning and lighting panels for the public areas.
  • Water meters for each use, and separately for restaurants.
  • Energy meters for cooling and heating, when the air conditioning system is central.
  • Connecting the meters to a remote reading system, so the split is based on data and not on manual readings.

A meter planned at the electrical and plumbing design stage is a detail on a drawing. A meter added after occupancy requires dismantling, downtime and sometimes changes to the panels.

Entrances, elevators and parking

Residents want a quiet, secure lobby, offices need a reception for visitors, and retail needs an entrance open to the public. When the routes cross, security and cleaning costs go up, and complaints arrive about strangers in the elevators.

Check in the drawings how people get from the parking garage to each use. A parking elevator that reaches both the residential and the retail floors requires access control by floor.

In the garage itself, it is worth planning separate zones with control between them, different operating hours, and lighting and ventilation by zone. If there is paid parking, decide in advance who the revenue belongs to and how it is offset against expenses.

Unsold units: why the budget is also the developer's problem

Until a unit is sold, the developer is the one who actually bears its share of the management and maintenance expenses. In a mixed-use complex, where the retail and offices are sometimes sold or leased more slowly than the residential, this can add up to a significant amount over time.

There is also a marketing side. Buyers ask what the management fees will be, and design decisions such as the number of elevators, the size of the lobby and operating hours determine the answer. An estimate built early makes it possible to answer honestly, and to adjust the design before the answer hurts sales.

Questions to ask the design team

  • Which systems serve more than one use, and exactly where is each use's consumption measured?
  • Can the residential entrance be closed without affecting the retail, and vice versa?
  • Which use will use the waste room and the loading area, and at what hours?
  • Does the allocation key in the bylaws match the meters actually planned, and the retail leases?
  • If the use of a floor changes in the future, for example from offices to residential, how will the split be updated?

Common mistakes, and why they happen

  1. Central air conditioning without energy meters for each use. The meters are cut at the value engineering stage because they look like an extra. Afterward, the use that operates long hours is subsidized by the others for years.
  2. A split by area alone. This is what happens when nobody prepared an alternative. Retail and residential pay the same for systems one of them hardly uses, and every year the argument opens again.
  3. One elevator for all uses without floor-by-floor control. The saving in construction translates into high security costs and constant complaints.
  4. Bylaws written after the systems were installed. They are worded around the systems already in place, instead of the systems being designed around the split. And after the sales, amending them depends on consent.

For the clauses worth including in the bylaws themselves, see the checklist on drafting agreed bylaws for an office building, a retail complex and a luxury tower. The wording of the sections themselves can be read in the Land Law.

How we do it

At the design stage we build the complex's maintenance budget estimate, and review the system suppliers from a maintenance perspective. When we also manage the complex after occupancy, the split that was agreed is the one actually applied. Every month, by the 10th, a detailed expense report goes out, line by line.

Planning a mixed-use complex? Read about maintenance consulting at the construction stage, and about managing the uses after occupancy in retail complex management and office building management.

Talk to us

We'd love to get to know your property

A short call to understand what you need, a site visit, and a detailed itemized proposal. No sales pressure and no commitment.

  • An itemized proposalCleaning, maintenance, security and management, each priced separately, so you can really compare.
  • A free site visitThe survey we make during the visit is yours to keep, even if you choose another company.
  • An answer within two business daysUrgent fault? Our service center is open 24/7 at +972-3-7736777.
Phone+972-3-7736777Emailoffice@achlagroup.com
HoursSun–Thu 08:00–17:00 · 24/7 service center

Leave your details

Fields marked are required. The rest help us come prepared.

Your details are used only to handle your inquiry and are not given to others for their own use. Privacy policy