  1. What the warranty year is, and where the name comes from
  2. Inspection periods by type of defect
  3. Common areas versus apartments
  4. The inspection walk: when and how
  5. How to report to the contractor
  6. Follow-up: where most committees fall short
  7. Common mistakes
  8. How we do it in the buildings we manage

The apartments have been handed over, residents have moved in and a building committee has been elected. From here on, the committee is the one facing the contractor over everything that is wrong in the common areas: the lobby, the elevators, the parking garage, the roof and the building systems. A defect that was not documented and reported on time is very hard to claim later. This guide covers what Israeli law sets out, what to do at each stage, and how we run the warranty year in the buildings we manage.

What the warranty year is, and where the name comes from

Israel's Sale (Apartments) Law sets two periods for the contractor. The inspection period (tkufat bedek) starts on the day the apartment is made available to the buyer, and its length depends on the type of defect: from one to seven years. After it comes a liability period of three more years. During the inspection period, a defect that appears is the contractor's responsibility unless the contractor proves the buyer caused it. During the liability period the burden shifts, and the buyer has to prove the defect originates in the design, the workmanship or the materials.

The name "warranty year" comes from two things: one year is the inspection period for any defect not listed in the law, and a defect that a reasonable inspection could have found on handover day must be reported within one year of that day. That is why the first year is the critical one, even though some periods run longer.

Inspection periods by type of defect

  • One year: any defect not on this list.
  • Two years: frames and carpentry, including aluminum; interior flooring and tiling, including subsidence and wear.
  • Three years: machinery and boilers; yard development, including paths, fences and the water, drainage, electrical and lighting systems in the yard; thermal insulation.
  • Four years: piping, including water, heating, gutters and sewage, and leaks; waterproofing of the structure, including basements, walls, ceilings and roofs.
  • Five years: cracks wider than 1.5 mm in non-load-bearing elements.
  • Seven years: detachment, peeling or crumbling of exterior cladding.
  • 20 years: a fundamental defect, meaning a defect in the load-bearing parts of the building that affects its stability and safety.

The list is based on the current schedule to the law. Before taking legal steps against a contractor, consult a lawyer.

Common areas versus apartments

Each resident handles the defects in their own apartment. The common areas belong to everyone, so in practice the committee coordinates them: it runs the inspection walk, collects the reports and sends the contractor one report on behalf of the building. When every resident sends the contractor a WhatsApp photo of the same leak in the garage, nobody knows what was reported, when, or what the answer was.

The inspection walk: when and how

  • Document and report every defect from day one, without waiting for the big walk. Order the full engineering inspection toward the end of the warranty year, after the building has been through a winter: a common mistake is ordering it at the start, before defects have had time to appear.
  • Bring an inspecting engineer who works for the building. The contractor has its own professionals, and the committee needs someone checking on its behalf.
  • Go area by area: roof, lobby and floors, elevators, machine rooms, garage, storage rooms, yard and landscaping.
  • For each defect, record the exact location (floor and area), the trade, a short description and a photo.
  • Rank by severity, and report safety defects first.

How to report to the contractor

  • In writing, not by phone. A written notice is the proof that the defect was reported on time.
  • One numbered report, with a photo and location for every item.
  • A target date for each defect. The law requires giving the contractor a fair opportunity to repair, and the contractor must repair within a reasonable time.
  • Documented closure. When the contractor repairs, take an "after" photo and confirm in writing that the defect is closed.

Follow-up: where most committees fall short

The first report goes out with energy. Two months later it is no longer clear what was fixed, what is in progress and what the contractor rejected. What you need is one list with a status for every defect, reminders on overdue items and a record of all correspondence. If a defect returns after the contractor already repaired it, or an urgent repair was not done within a reasonable time, the law lets you repair it yourselves and charge the contractor. Without documentation, that is hard to prove.

Common mistakes

  1. Waiting until the end of the year to report everything at once. A defect visible on handover day must be reported within a year, and anything found later must be reported within a reasonable time of discovery.
  2. Repairing it yourselves before the contractor had a chance, which makes it hard to recover the cost.
  3. No "after" photo, so there is no way to prove the defect came back.
  4. Assuming it all ends after a year. Waterproofing and piping run for four years, exterior cladding for seven.
  5. The committee changes and the knowledge leaves with it. When the records live on one member's phone, they disappear with that member.
  6. Forgetting the lighting. Toward the end of the year, collect every faulty light fixture and send the contractor one list.

How we do it in the buildings we manage

Our management system has a dedicated module for warranty defects in the common areas:

  • Full documentation for every defect: location, trade, severity, target date and up to five "before" photos. Our team reports from the field app, and the committee can report from its portal.
  • Every defect goes to the right contact at the contractor. Each contact receives only their own defects, and a full report can be produced as PDF or Excel.
  • A status for every defect: open, sent to contractor, in progress, fixed, closed, or disputed with a reason. A defect cannot be closed without an "after" photo.
  • Transparency for the committee: the committee sees the full list in its portal in real time and can download a report whenever it wants.
  • An alert before the period ends: each trade has its inspection period, and the system alerts 90 days before it ends, so no defect is left unreported.
  • The knowledge stays with the building: the full history stays in the system even when the committee changes.

Residents also get a personal tool in the app for documenting defects inside their own apartment, with a room-by-room walk and a PDF report to send to the contractor. The tool is private, and only the household can see it.

Moving into a new building and looking for a management company to lead the warranty year with the contractor? See residents' committee management. If the building is still before occupancy, read about pre-construction consulting and what happens between Form 4 and move-in.

Talk to us

We'd love to get to know your property

A short call to understand what you need, a site visit, and a detailed itemized proposal. No sales pressure and no commitment.

  • An itemized proposalCleaning, maintenance, security and management, each priced separately, so you can really compare.
  • A free site visitThe survey we make during the visit is yours to keep, even if you choose another company.
  • An answer within two business daysUrgent fault? Our service center is open 24/7 at +972-3-7736777.
Phone+972-3-7736777Emailoffice@achlagroup.com
HoursSun–Thu 08:00–17:00 · 24/7 service center

Leave your details

Fields marked are required. The rest help us come prepared.

Your details are used only to handle your inquiry and are not given to others for their own use. Privacy policy